K-01 MUSIC SCORING STUDIO
-
BOX IN BOX construction
-
electrical connections up to 250 kW
-
15dB NC air-conditioning
A-Studio
-
area 430 m2 (~ 4628 ft²)
-
capacity: symphonic orchestra and/or chorus of 120 people
-
height 11m (~ 36 ft)
-
variable ceiling geometry / variable reverberation characteristics
-
Steinway Concert Grand Piano D-274
B-Studio
-
area 50 m2 (~ 538 ft²)
-
variable walls geometry / variable reverberation characteristics
C-Studio
-
area 8 m2 (~ 86 ft²)
-
optimized acoustics for vocal recordings and solo instruments
Control Room
-
area 60 m2 (~ 645 ft²)
-
Neve 88R console with AMS Neve Encore™ Plus automation system
-
5.1 and Stereo system
Levels 1 and 2
-
rehearsal room and private lounge
-
4K / 35mm Video Control Room
K-04 SOUND STAGE 4
-
area 2000 m2 (~ 21 527 ft²)
-
height 16 m (~ 52.5 ft)
-
artificial sky-dome 3200° - 255 Spacelights, power up to 1,8 MW
-
lighting 3200° frontline and backline 650kW
-
light groups height adjustment in scope from 2 to 16 m (6.5 ft to 52.5 ft)
-
additional electrical connections up to 1,4 MW
-
wardrobes and make-up stands
-
air-conditioned set
-
workshop 1 - 350m2 (~ 3767 ft²)
K-05 SOUND STAGE 5
-
area 124 m2 (~ 1333 ft²)
-
height 6 m (~ 19.5 ft)
-
shadeless Green Screen 180°, dimensions 12x7m (~ 39x23 ft), depth of field up to 8 m (~ 26 ft)
-
connections up to 40 kW
-
wardrobes and make-up stands
-
air-conditioned set
K-06 COLOR CORRECTION STUDIO
-
area 124 m2 (~ 1334 ft²)
-
height 6 m (~ 19.5 ft)
-
projector Sony SRX-R110 SXRD 4K
-
SCREEN: HARKNESS HALL, SIZE:
-
real-time color correction 4K Filmlight Baselight Eight
-
Truelight 3D Color Management System
-
connections up to 40 kW
-
wardrobes and make-up stands
-
air-conditioned set
K-07 4K COLOR CORRECTION AND FILM DUBBING THEATRE
-
area 490 m2 (~ 5274 ft²)
-
studio dedicated to premixing, mixing and mastering
-
console: AMS Neve DFC Gemini with AMS Neve Encore TM Plus automation system
-
projector Sony SRX-R110 SXRD 4K
-
screen 10,15 x 4,23 m (~ 33.3 x 13,8 ft)
-
scanner Northlight 2 - 8K 35mm/ 4K Super 16mm/16mm
-
formats: Academy / Scope / Full-gate
-
Celco Fury - 4/8K Digital Motion Picture Recorder
-
real-time color correction 4K Filmlight Baselight Eight
-
Truelight 3D Color Management System
-
telecine Sondor ALTRA V1, 35 mm HD Scala Color Software
-
reference monitors LCD Cine-tal Cinemage HD
-
4K LCD monitor Astro DM-3400 56"
-
electrical connections up to 200 kW
-
video-conference room
-
wardrobes and make-up rooms
-
15dB NC air-conditioning
-
K07 Film Dubbing Theatre has achieved Dolby Premier Studio Certification - Technical excellence at every level of the studio’s operation
K-13 POWER GENERATOR
-
two power generators, power: 1,2 MW each
-
fuel tank for generator supply, volume 11000 liters
K-08 CENTRAL MACHINE ROOM
-
Telecine Room: Cintel Millennium HD, Pogle Pandora Color Correction, Aaton Keycode reader with HD& SD Keylink, Cinetal Cinemage Display ver. 4.1.3, Tektronix 1735 HD, DVS Clipster
-
Film Recording room: Celco Fury - 4/8K Digital Motion Picture Recorder
-
Video recorder Sony HDCam SR SRW-5000
-
Video recorder Sony DigitalBeta DVWM-2000P
-
digital transmission of image and sound from the central machine room to all studios through optical fiber connections
-
satellite connection with external shooting locations
-
compatible with all SD/HD video formats
-
emergency power supply (UPS), power 2 x 160 kVA and power 300 kVA
K-09 FILM EDITING AND VISUAL EFFECTS STUDIO
-
video editing
-
DVS Clipster 4K - 9600 -EDL editing/ conforming - uncompressed editing 4K
-
Avid Nitris DX Media Composer
-
Apple Final Cut Studio 2 + Aja Kona 3
-
reference monitors LCD Cine-tal Cinemage HD
-
monitor LCD Astro DM-3400 56" 4K Cine-tal reference
-
projection system Christie LX1500
-
graphics and animation / visual effects: Flame/Flare, Nuke, Houdini, Mocha/Boujou/PF Track, AfterEffects / Maya rendering - 80-core cluster - 1,5 Teraflops
-
air-conditioning 15dB NC
-
safety data storage - tape library ADIC SCALAR i2000 - LTO-3 - 5,6PB
K-08 CENTRAL MACHINE ROOM
-
Telecine Room: Cintel Millennium HD, Pogle Pandora Color Correction, Aaton Keycode reader with HD& SD Keylink, Cinetal Cinemage Display ver. 4.1.3, Tektronix 1735 HD, DVS Clipster
-
Film Recording room: Celco Fury - 4/8K Digital Motion Picture Recorder
-
Video recorder Sony HDCam SR SRW-5000
-
Video recorder Sony DigitalBeta DVWM-2000P
-
digital transmission of image and sound from the central machine room to all studios through optical fiber connections
-
satellite connection with external shooting locations
-
compatible with all SD/HD video formats
-
emergency power supply (UPS), power 2 x 160 kVA and power 300 kVA
K-10 CASTING, REHEARSAL AND MOTION CAPTURE STUDIO
-
area 700 m2 (~ 7534 ft²)
-
Vicon Motion Capture MX T 160 Cameras / 24 cameras/
-
air-conditioned set
K-11 SOUND POST-PRODUCTION STUDIO
-
BOX IN BOX construction
-
15dB NC air-conditioning
A-Control Room
-
area 30m2 (~ 322 ft²)
-
mixing console: AMS Neve MMC300 with AMS Neve Encore TM Plus automation system
-
5.1 and Stereo system
A-Studio
B-Control Room
-
area 26 m2 (~ 280 ft²)
-
mixing console: AMS Neve MMC300 with AMS Neve Encore™ Plus automation system
-
5.1 and Stereo system
B-Studio
Rehearsal room
K-13 POWER GENERATOR
-
two power generators, power: 1,2 MW each
-
fuel tank for generator supply, volume 11000 liters
K-03 SOUND STAGE 3
-
area 2000 m2 (~ 21 505 ft²)
-
height 16 m (~ 52.5 ft)
-
spherical shadeless Blue Screen 3D - 180°, dimensions 80m x 15 m (~ 262.5x49 ft), depth of field up to 50 m (~ 164 ft)
-
Blue Screen lighting - 250 kW - 3200°
-
lighting 3200° frontline and backline 650 kW
-
electrical connections up to 1 MW
-
air-conditioned wardrobes and make-up rooms
-
air-conditioned set
MOBILE UNITS
-
16 x swap body system - operating at temperatures of -40 to +40°C (-40 to +104°F)
-
production offices
-
make-up buses
-
honey wagons
-
kitchen and catering
-
workshops
-
power generators : 2x 530kVA operating simultaneously
-
mobile fuel station
LABORATORY
chemical laboratory: FilmLab ECN-2 12MD58 14/67 / Ultrasonic Film Cleaner - Ultrasonic CF8200.
CINETEL (under construction 2011)